- All Routes
- Eastern: Anglia
- Eastern: East Coast
- Eastern: East Midlands
- Eastern: North & East
- North West & Central: Central
- North West & Central: North West
- North West & Central: West Coast Mainline South
- Southern: Kent
- Southern: Network Rail High Speed
- Southern: Sussex
- Southern: Wessex
- Wales & Western: Wales & Borders
- Wales & Western: Western
Eastern: Anglia news
More reliable journeys through Norfolk as Network Rail upgrade 100-year-old swing bridges
Network Rail is renewing and refurbishing the existing electrical and mechanical parts of three swing bridges in Norfolk to keep services running reliably and prevent disruption at the ports and marinas.
Network Rail to carry out essential track works across the north of the Anglia region
Network Rail will carry out essential track works in the Norfolk, Suffolk and Cambridgeshire areas during weekends in May and June to keep rail services running safely and reliably for passengers across the region.
Increasing rail capacity through Ely - public consultation dates announced
Network Rail is inviting the public to comment on proposals and options to increase rail capacity through Ely as part of a six-week consultation from 24 May 2021.
Passengers urged to check before they travel as Anglia’s rail network set for further upgrades next month
Passengers travelling into London on the Great Eastern Main Line and Southend lines are urged to check before they travel next month (May) as planned upgrades will be carried out to improve reliability.
Sheep put themselves in shear danger taking a short-cut on busy Cambridgeshire rail line
Network Rail staff were called out to Queen Adelaide village in Ely on Wednesday 7 April at 9:45am after reports of sheep making a wrong turning at the level crossing and taking a short-cut down the Ely to Peterborough rail line.
Network Rail completes safety upgrades at three Suffolk crossings
Three level crossings in Woodbridge, Suffolk have been upgraded with new equipment that make them safer.
Fewer rail delays between London and Cambridge following completion of track works
Over two miles of track has been replaced on the West Anglia Main Line which will reduce the number of delays caused by track faults for passengers travelling between Liverpool Street, Stansted and Cambridge.
Passengers urged to check before they travel as Anglia’s rail network set for upgrades this Easter
Passengers who need to travel into London from Norfolk, Suffolk and Essex over Easter are urged to check their journeys in advance as Network Rail plans to carry out major upgrades to improve reliability on the busy main line and Southend branch lines.
Results 153 - 160 out of 924