- All Routes
- Eastern: Anglia
- Eastern: East Coast
- Eastern: East Midlands
- Eastern: North & East
- North West & Central: Central
- North West & Central: North West
- North West & Central: West Coast Mainline South
- Southern: Kent
- Southern: Network Rail High Speed
- Southern: Sussex
- Southern: Wessex
- Wales & Western: Wales & Borders
- Wales & Western: Western
National & regional news

Children warned of the dangers of playing on the railway following near miss at Welsh level crossing
Children are being reminded of the importance of obeying signals and signs at level crossings following a near miss with a train at a Welsh level crossing.

Network Rail unveils new bridge in Dorset to improve pedestrian safety
Network Rail has opened a new footbridge in Wool, Dorset as part of its Railway Upgrade Plan to deliver a better, safer railway.

Network Rail and GWR remind passengers to plan their journey, ahead of Severn Tunnel upgrade
Rail passengers are being reminded to plan their journeys before travelling, ahead of a six-week closure of the Severn Tunnel to prepare the Great Western Mainline for a brand new fleet of electric trains.

Network Rail appoints new route managing director for Wessex
Network Rail has appointed Becky Lumlock as route managing director for Wessex, one of the busiest routes on the rail network which includes Britain’s busiest railway station, Waterloo, and the major commuter area to the south and west of London.

Rail passengers urged to check before they travel ahead of Barnsley track renewal
Passengers traveling to and from Barnsley are being advised to check before they travel as Network Rail plans to replace the track at a busy level crossing in the town centre.

Full service to resume from tomorrow morning as Leicestershire bridge repairs continue
A full train service will resume from tomorrow morning after Network Rail completed the first phase of repairs to the partially collapsed road-over-rail bridge in Barrow upon Soar.

The Thameslink Programme successfully tests new trains using advanced “in-cab” signalling system
An advanced signalling system that will allow trains to travel every two to three minutes through central London was successfully tested using Govia Thameslink Railway’s new Siemens Class 700 trains for the first time.
Results 7769 - 7776 out of 14381