TRAINS HIT RECORD HIGH IN APRIL AS c2c SMASH ANNUAL BEST: c2c train

Wednesday 12 May 2010

TRAINS HIT RECORD HIGH IN APRIL AS c2c SMASH ANNUAL BEST

Region & Route:
| Eastern: Anglia
| Eastern

c2c breaks all-time British punctuality record

The number of trains arriving on time hit a new record high in April with 94% of trains across the country arriving punctually.

Almost 98% of trains on the c2c route arrived on time, pushing the operator's performance for the past year up to 96.7% - a new all time record for any British train operator and well ahead of services in continental Europe, including Switzerland.

The figures were released today in Network Rail's regular monthly report on train performance.  During the period from 1 April to 1 May, 94.0% of services arrived on time.  This compares to 93.6% in same period, period 1, last year.

Andrew Munden, Network Rail route director for Anglia, said: "Train punctuality continues to go from strength to strength. Delivering an even better service for our customers and for passengers remains our primary focus as high levels of investment to beat bottlenecks and overcrowding continue."

In all, 11 of the 19 operators saw their performance improve, or stay at record high levels, compared to the same period last year, with Virgin Trains and London Midland seeing the biggest improvement in performance this month compared to the same period last year. Four of the 19 operators saw significant movement in their performance (over three percentage points):

Table of operators that saw the most significant changes in performance

 

 

P1 2010/11 

 P1 2009/10  

 % point change

 Virgin Trains     

89.1% 

80.3%

+8.8%

 East Coast  

86.4%

90.3%

 -3.9%

 CrossCountry   

87.8% 

91.3%  

 -3.5%

 London Midland 

92.6%   

89.6%

 +3%



Notes to editors

1) East Coast and CrossCountry trains’ performance were both affected by external factors including a major landslip caused by heavy rain on the East Coast main line near Berwick upon Tweed which closed the railway from 31 March – 3 April. CrossCountry services were also affected by a series of cable theft incidents and a power failure at Birmingham New Street.

2) Arrived on time - the measure of train punctuality also known as PPM (public performance measure) means trains arriving at their destinations within five minutes for commuter services and within 10 minutes for long distance services. This measure of punctuality is commonly used throughout Europe

3) National train punctuality is measured for all trains across the whole of each, including cancelled services and delays caused by external factors (such as vandalism, extreme weather, suicides etc).  Punctuality did not start to be recorded in this vigorous and thorough way until 1997.  Before then Railtrack, and BR before it, did not measure all services and also excluded external factors and other items from their numbers

4) These figures represent provisional data for the period and individuals operators performance data may vary slightly from the full period performance report  that Network Rail publishes on its website around one month after period end

5) Network Rail and the train operators run more trains across Great Britain than are run in most European countries - almost 20% more than in France and 60% more than in Italy. Great Britain's 24,000 trains per-day is also more than Spain, Switzerland, The Netherlands, Portugal and Norway combined

Period 1 of 2010/11 - 01 April to 1 May 2010

 

Franchise

Punctuality P1

2010/11

Punctuality P1

2009/10

Moving Annual Average (MAA)

Arriva Trains Wales

96.5%

95.6%

94.9%

c2c Rail

97.8%

97.0%

96.7%

Chiltern

95.8%

94.4%

95.3%

CrossCountry

87.8%

91.3%

89.8%

East Coast

86.4%

90.3%

87.0%

East Midlands Trains

94.9%

94.4%

92.5%

First Capital Connect

92.9%

92.9%

89.4%

First Great Western

93.4%

93.8%

92.4%

First Scotrail

94.0%

93.7%

90.6%

First Transpennine Express

94.5%

94.9%

92.1%

London Midland

92.6%

89.6%

90.1%

London Overground

96.0%

94.8%

93.3%

Merseyrail

95.9%

97.4%

96.2%

Northern Rail

93.5%

93.9%

91.5%

National Express East Anglia

92.7%

91.9%

91.1%

Southeastern

92.9%

94.7%

89.3%

Southern

94.7%

93.8%

90.8%

South West Trains

96.8%

95.0%

93.0%

Virgin Trains

89.1%

80.3%

85.3%



   

National

94.0%

93.6%

91.5%

PPM

PPM is a % measure of passenger trains arriving ‘on time’ at their scheduled destination. For long distance trains ‘on time’ is within 10 minutes of the timetabled arrival time, for all others it is within 5 minutes.

Heathrow Express, Grand Central, Hull Trains, Eurostar and Wrexham and Shropshire are not included in the National PPM.

MAA

Moving annual average

 

Note: The data contained within this report is for initial indications only and is subject to change in subsequent publications

Contact information

Passengers / community members
Network Rail national helpline
03457 11 41 41

Latest travel advice
Please visit National Rail Enquiries

Journalists
Network Rail press office - South East route
020 3357 7969
southeastroutecomms@networkrail.co.uk

About Network Rail

We own, operate and develop Britain's railway infrastructure; that's 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We run 20 of the UK's largest stations while all the others, over 2,500, are run by the country's train operating companies.

Usually, there are almost five million journeys made in the UK and over 600 freight trains run on the network. People depend on Britain's railway for their daily commute, to visit friends and loved ones and to get them home safe every day. Our role is to deliver a safe and reliable railway, so we carefully manage and deliver thousands of projects every year that form part of the multi-billion pound Railway Upgrade Plan, to grow and expand the nation's railway network to respond to the tremendous growth and demand the railway has experienced - a doubling of passenger journeys over the past 20 years.

Follow us on Twitter: @networkrail
Visit our online newsroom: www.networkrailmediacentre.co.uk