LONGER PLATFORMS INTRODUCE 12-CAR TRAINS FROM CAMBRIDGE: 12-car trains at Cambridge

Tuesday 12 May 2009

LONGER PLATFORMS INTRODUCE 12-CAR TRAINS FROM CAMBRIDGE

Region & Route:
| Eastern: Anglia
| Eastern
  • New May 17th timetable will see 12-carriage trains depart Cambridge for King’s Cross for the first time
  • Network Rail has lengthened platforms and carried out power upgrades to enable more and longer trains to use the network.
  • A revised timetable and the introduction of 20 additional carriages will result in over 5000 peak seats being added to the route

The most significant change to the Great Northern (GN) route timetable for at least 15 years will take place on May 17th. The new timetable sees five additional trains added to the timetable in the first step to significantly reduce overcrowding.

The 7.15AM and 7.45AM departures for London King’s Cross, once listed as some of the most overcrowded trains in the country, will be strengthened from eight carriages to twelve carriages.

There will also be significant changes to the evening timetable returning to Cambridge, with faster journey times. The additional rolling stock also enables significant enhancements to off-peak travellers – for example the 14.56 departure from Ely to London King’s Cross on Sunday’s will be doubled in length from four carriages to eight.

Network Rail lengthened platforms at Cambridge and Royston to allow longer trains to stop and also invested £1.6m to upgrade the power supply along the route to London, allowing more and longer trains to run.

Richard Lungmuss, Route Director at Network Rail, said: “The platform extensions at Cambridge and Royston and the improvements to the power supply will both make a real difference to passengers, allowing 12-car trains to run for the very first time and increasing capacity on this busy line. This marks a significant milestone as we continue to explore ways to increase capacity across the rail network.”

Jim Morgan, Managing Director at First Capital Connect said: “The new timetable, extra carriages and infrastructure improvements, means we will have increased peak seats by over 5000 in the past year. This is very much the first step, and in partnership with the Department for Transport and Network Rail, we would like to continue to work on increasing capacity on our services.”

Notes to editors

The first 12-carriage trains from Cambridge to London King’s Cross will leave on 18th May 2009. 7.15AM Cambridge to London King’s Cross (calling at Royston at 7.29AM) arriving at 08.06AM. 7.45AM Cambridge to London King’s Cross (calling at Royston at 7.29AM) arriving at 08.39AM.

Contact information

Passengers / community members
Network Rail national helpline
03457 11 41 41

Latest travel advice
Please visit National Rail Enquiries

Journalists
Network Rail press office - South East route
020 3357 7969
southeastroutecomms@networkrail.co.uk

About Network Rail

We own, operate and develop Britain's railway infrastructure; that's 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We run 20 of the UK's largest stations while all the others, over 2,500, are run by the country's train operating companies.

Usually, there are almost five million journeys made in the UK and over 600 freight trains run on the network. People depend on Britain's railway for their daily commute, to visit friends and loved ones and to get them home safe every day. Our role is to deliver a safe and reliable railway, so we carefully manage and deliver thousands of projects every year that form part of the multi-billion pound Railway Upgrade Plan, to grow and expand the nation's railway network to respond to the tremendous growth and demand the railway has experienced - a doubling of passenger journeys over the past 20 years.

Follow us on Twitter: @networkrail
Visit our online newsroom: www.networkrailmediacentre.co.uk