Region detail
Latest news for this route

Kent passengers urged to check before travelling on Tuesday as some additional trains diverted to and from London Blackfriars
Rail passengers in Kent are asked to check before travelling on Tuesday 29 August as trains which had been diverted to run into Waterloo while major improvement work is carried out in and around London Bridge will run to and from London Blackfriars instead. The number of trains running will not be affected.

Baillieston railway bridge replacement to improve local road network
Network Rail will shortly begin a year-long £4m programme of work to replace and widen the bridge over the railway at Muirhead Road, Baillieston.

Alexandria’s Bank Street to close for rail bridge refurbishment
Bank Street in Alexandria will close for seven weeks from tonight (11.59pm Monday, August 28), while Network Rail engineers carry out work to repair and strengthen the railway bridge over the road.

Two major East Coast Main Line upgrades ahead of introduction of new Azuma trains
Preparations for the exciting Virgin ‘Azuma’ trains move two steps closer to completion this month, as major railway upgrades are completed.

Emergency repairs to bridge means road and rail disruption in Bolton
Emergency repairs to a bridge damaged by a burst water main will impact road and rail travel south of Bolton for several weeks.

Politicians get on track with Scotland’s railway
Scotland’s politicians are getting the chance to see first-hand what it takes to keep the nation’s railway moving.

Forth Bridge offers platform to celebrate Queensferry Crossing
Network Rail is to mark the opening of Queensferry Crossing by offering rare public access to the Forth Bridge. The fundraising event on behalf of official charity partner Barnardo’s Scotland, will take place on September 23 and, due to high demand, September 24, three weeks after the official opening of the Forth’s newest long-span bridge.

Murieston Road, Livingston to close for vital bridge refurbishment
Murieston Road in Livingston will close for 12 weeks from September 4 while Network Rail engineers carry out work to repair and strengthen the railway bridge over the road.
Results 7033 - 7040 out of 14541