Region detail
Latest news for this route

Night-time engineering works for Glasgow’s south side
Engineers will soon be working overnight at locations between Kennishead and Crossmyloof to install foundations for electrification masts.

Reston Station construction is underway
Work is now underway to build the new Reston station in the Scottish Borders.

Up, up and away: Easter lift for Warrington Bank Quay bridges
A giant crane will be used to upgrade bridges around Warrington Bank Quay station this Easter to make future rail journeys more reliable for passengers and freight.

Bristol economy set to get power up thanks to Bristol Temple Meads station improvements
Businesses in Bristol will benefit from a £10.2m upgrade of Bristol Temple Meads station with much of the money set to be spent on local companies.

Month to go until three-day closure including a Friday at King’s Cross as Network Rail transforms track layout to improve reliability
- No trains at King’s Cross on Friday 23, Saturday 24 or Sunday 25 April
- Only travel if absolutely essential on Saturday 24 and Sunday 25 April
- Network Rail is improving the track layout at King’s Cross and reopening a disused tunnel in the main stage of a £1.2billion upgrade of the East Coast Main Line
- Work will allow more trains to enter and exit the station, reduce congestion and bring smoother, more reliable journeys for passengers
- Passengers should continue to minimise travel and follow the latest Government guidance

A sign of things to come at Leven
Network Rail is advising people who are using the disused Leven railway corridor to ‘be aware’ as activity increases ahead of work to reinstate the line.

This is a platform alteration – all change at London King’s Cross next month as Network Rail continues to transform track layout
- Network Rail is improving the track layout at London King’s Cross and reopening a disused tunnel in the main stage of a £1.2billion upgrade of the East Coast Main Line
- Slightly reduced services continue to run over the Easter bank holiday for passengers making essential journeys, and people are urged to minimise travel
- No trains to/from London King’s Cross on Friday 23, Saturday 24 or Sunday 25 April
- Platforms 0-6 will reopen for passengers on 26 April as work begins at platforms 7-11

Super-fast Northampton railway upgrades complete for passengers
A year’s worth of work to upgrade the railway in Northampton has been completed in just five days by Network Rail.
Results 3633 - 3640 out of 14381