Monday 5 Aug 2024

Work being carried out on the bridge towards the end of the 16 days, with the new steel parapet in place

Regions:
Eastern: Anglia

Download

Work being carried out on the bridge towards the end of the 16 days, with the new steel parapet in place.jpeg
4032px * 2268px
4.51 MB
Work being carried out on the bridge towards the end of the 16 days, with the new steel parapet in place