Tuesday 18 Apr 2017

SE Route Easter- Sevenoaks Tunnel

Regions:
Southern

Staff walk to one of the worksites deep in the 2-mile long Sevenoaks Tunnel

Download

SE Route Easter-27.jpg
5472px * 3648px
24.25 MB
SE Route Easter- Sevenoaks Tunnel: Staff walk to one of the worksites deep in the 2-mile long Sevenoaks Tunnel