Friday 27 Aug 2010

FINAL TRACKS LAID ON AIRDRIE-BATHGATE RAIL LINK_2

Regions:
Scotland’s Railway: Scotland

Hugh Wark, Senior Project Manager (left) and Alan Macmillan, Scheme Sponsor (right) install the final 'golden' pandral clip on the Airdrie-Bathgate line this morning (27 Aug). The 15 miles of new track now link passenger branch lines to Airdrie and Bathgate for the first time in more than fifty years.

Download

last tracks 2.jpg
1296px * 1944px
147.23 KB
FINAL TRACKS LAID ON AIRDRIE-BATHGATE RAIL LINK_2: Hugh Wark, Senior Project Manager (left) and Alan Macmillan, Scheme Sponsor (right) install the final 'golden' pandral clip on the Airdrie-Bathgate line this morning (27 Aug). The 15 miles of new track now link passenger branch lines to Airdrie and Bathgate for the first time in more than fifty years.