Wednesday 3 Feb 2021

The Wavewalker installing the piling at the second section of new sea wall

Regions:
Wales & Western

Download

BCM_5288.jpg
5952px * 4480px
14.64 MB
The Wavewalker installing the piling at the second section of new sea wall