West Highland recovery works update: track washout near Crianlarich sleepers

Thursday 8 Aug 2019

West Highland recovery works update

Region & Route:
Scotland’s Railway: Scotland

Train services will be reintroduced between Crianlarich and Oban from Monday, but the line will remain closed between Ardlui and Crianlarich until Thursday, August 22.

Engineers are on-site working around-the-clock to repair the line as quickly as possible for customers.

Detailed geotechnical and aerial surveys of the damage between Ardlui and Crianlarich have now been completed, allowing engineers to fully understand the extent of the repairs needed to reopen the railway.

The line has been closed since Sunday, August 4, after heavy rainfall caused the slope supporting the railway to give way at several points on a section of track in Glen Falloch.

Floodwater washed the track-bed out from beneath the line and engineers will have to replace thousands of tonnes of lost material to rebuild the supporting slope before they can repair the track itself.

The flooding also damaged ballast under the track on the Oban branch line, near Tyndrum.

The recovery works are further complicated by the remote location of the sites and the ongoing weather conditions.

To keep passengers moving ScotRail services are currently running between Glasgow Queen Street and Arrochar/ Ardlui and between Crianlarich and Fort William / Mallaig.  Buses are operating between Arrochar and Crianlarich, and to Oban.

Some train services will be introduced between Crianlarich and Oban from Monday, August 12, once engineers repair the flood damage around Tyndrum.

A final timetable will be confirmed in the coming days and customers are advised to visit the ScotRail website, download the app, or check @ScotRail on Twitter for the latest information before travelling on Monday.

Liam Sumpter, Route Director for Network Rail Scotland, said: “Our engineers will be working around-the-clock to reopen the line as quickly as possible for our customers.

“This is a very complex repair as we need to reconstruct the slope beneath the line – replacing thousands of tonnes of lost material – before we can repair the tracks above.

“We are keeping passengers on the move. ScotRail trains are running between Glasgow and Arrochar and Ardlui, and between Crianlarich and Mallaig. We also plan to reopen the line between Crianlarich and Oban on Monday.”

Passengers can check their journey at National Rail Enquiries https://www.nationalrail.co.uk/ or with their train operator https://www.scotrail.co.uk/ https://www.sleeper.scot/.

Contact information

Passengers / community members
Network Rail national helpline
03457 11 41 41

Latest travel advice
Please visit National Rail Enquiries

Journalists
Network Rail press office - Nick King
Media relations manager (Scotland)
0141 555 4108 / 07515 617073
nick.king3@networkrail.co.uk

About Network Rail

We own, operate and develop Britain's railway infrastructure; that's 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We run 20 of the UK's largest stations while all the others, over 2,500, are run by the country's train operating companies.

Usually, there are almost five million journeys made in the UK and over 600 freight trains run on the network. People depend on Britain's railway for their daily commute, to visit friends and loved ones and to get them home safe every day. Our role is to deliver a safe and reliable railway, so we carefully manage and deliver thousands of projects every year that form part of the multi-billion pound Railway Upgrade Plan, to grow and expand the nation's railway network to respond to the tremendous growth and demand the railway has experienced - a doubling of passenger journeys over the past 20 years.

Follow us on Twitter: @networkrail
Visit our online newsroom: www.networkrailmediacentre.co.uk