Network Rail completes safety upgrades at three Suffolk crossings: Haywards 2

Tuesday 30 Mar 2021

Network Rail completes safety upgrades at three Suffolk crossings

Region & Route:
Eastern: Anglia

Three level crossings in Woodbridge, Suffolk have been upgraded with new equipment that make them safer.

In September last year, Network Rail began work to upgrade three level crossings on the East Suffolk Line:

  • Haywards (on Tide Mill Way)
  • Ferry Lane
  • Jetty Avenue (on Jetty Lane)

Full barriers have now been installed at Haywards and Ferry Lane level crossings which cover both sides of the road and prevent vehicles from weaving around them, making the crossing safer. These crossings have also been fitted with obstacle detection which automatically detects anything that may be obstructing the crossings, for example a pedestrian or a car. At these crossings you must stop when the lights show and wait until the barriers raise to continue your journey.

At the crossing on Jetty Avenue, miniature stop lights and an audible warning system have been installed which give the green light when it is safe to cross. At this crossing, an audible warning and a red light will activate when a train is approaching. If the red light is still on and the audible warning is still sounding after the train has passed another train will be coming. You should only cross when the green light is showing and no warning is sounding. Drivers of large or slow vehicles, or those with animals should phone for permission to cross before proceeding.

All three level crossings also benefit from newer signalling equipment which helps signallers understand where trains are in relation to the level crossings. This means that the level crossing alarms at the Haywards and Ferry Lane road crossings can be safely reduced from around 70 seconds long to approximately 20 seconds long for each train passage, to reduce the noise experienced by nearby residents.

These safety improvements are vital in this area where there has been significant amount of residential development over recent years. The new equipment will be better able to cope with this higher demand as well as enabling services to run safely and reliably.

Ellie Burrows, Network Rail’s route director for Anglia, said: “We’ve seen an increase in the number of pedestrians and traffic using these crossings and this work is vital to improve safety for everyone using them. We’ve also carried out work that will keep rail services running safely and smoothly on this line busy line.”

For more information about how to stay safe at level crossings and the different types of crossing go to www.networkrail.co.uk/levelcrossings

Contact information

Passengers / community members
Network Rail national helpline
03457 11 41 41

Latest travel advice
Please visit National Rail Enquiries

Journalists
Network Rail press office - Katie Mack
Media relations manager (Anglia route)
0330 8577 132
Katie.Mack@networkrail.co.uk

About Network Rail

We own, operate and develop Britain's railway infrastructure; that's 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We run 20 of the UK's largest stations while all the others, over 2,500, are run by the country's train operating companies.

Usually, there are almost five million journeys made in the UK and over 600 freight trains run on the network. People depend on Britain's railway for their daily commute, to visit friends and loved ones and to get them home safe every day. Our role is to deliver a safe and reliable railway, so we carefully manage and deliver thousands of projects every year that form part of the multi-billion pound Railway Upgrade Plan, to grow and expand the nation's railway network to respond to the tremendous growth and demand the railway has experienced - a doubling of passenger journeys over the past 20 years.

Follow us on Twitter: @networkrail
Visit our online newsroom: www.networkrailmediacentre.co.uk