National train performance for period 11 is 89% despite severe storms: Damage to the railway at Dawlish in Devon

Friday 7 Feb 2014

National train performance for period 11 is 89% despite severe storms

Region & Route:
National

A second month of severe storms and the wettest January on record tested the rail industry’s resilience during a difficult period 11.

Punctuality on the railways reached 89.0% during Period 11, according to monthly performance data released today by Network Rail. The data for Britain's train services covers the period from 05 January 2014 - 01 February 2014. This compares to 87.3% for the same period last year. The moving annual average is now at 90.2%.

During the last month an already saturated railway has seen further record levels of rainfall and storms bringing strong winds and further substantial damage to the rail network including almost 100 trees brought down and over 140 flooded sites and landslips, some blocking major routes. Thousands of railway staff responded with dedication and professionalism to repair, and continue to repair the damage caused.

Our projection for performance on exiting CP4 has been further eroded as a result of the weather over the last few months and we now predict this to be less than 90.3% rather than 91.4% the ORR forecast in the final determination.

Franchise

Punctuality %
Period 11, 2013/14

Punctuality %
Period 11, 2012/13

Moving annual
average (MAA)

Arriva Trains Wales

92.8

91.5

93.5

c2c Rail

96.2

95.9

96.9

Chiltern

95.2

92.9

95.3

Crosscountry

86.4

81.7

87.7

East Coast

88.1

71.5

83.6

East Midlands Trains

90.4

90.2

91.2

First Capital Connect

82.4

81.0

86.3

First Great Western

88.0

87.9

88.7

First Scotrail

93.3

92.8

91.1

First Transpennine Express

92.8

88.8

90.3

Greater Anglia

91.6

86.3

92.0

London Midland

87.7

79.8

85.9

London Overground

96.7

94.4

96.1

Merseyrail

97.3

95.2

95.8

Northern Rail

93.4

89.2

90.8

Southeastern

86.6

85.5

89.8

Southern

79.2

81.9

86.8

South West Trains

83.0

88.4

90.2

Virgin Trains

89.2

72.0

85.3

Total

89.0

87.3

90.2

Notes to editors

  • Delays attributable to Network Rail (this includes external factors such as fatalities, which made up around 20% of all delays) accounted for 60% of delays nationally during the period
  • For Southern, the extreme weather had a particularly significant impact with scores of trees blocking routes and a handful of major landslips on the patch
  • Arrived on time - the measure of train punctuality also known as PPM (public performance measure) means trains arriving at their destinations within five minutes for commuter services and within 10 minutes for long distance services.
  • This measure of punctuality is commonly used throughout Europe
  • National train punctuality is measured for all trains across the whole network, including cancelled services and delays caused by external factors (such as vandalism, extreme weather, suicides etc).
  • Punctuality did not start to be recorded in this vigorous and thorough way until 1997. Before then Railtrack, and BR before, did not measure all services and also excluded external factors and other items from their numbers
  • These figures represent provisional data for the period and individual operators' performance data may vary slightly from the full period performance report that
  • Network Rail publishes on its website every month
  • Network Rail and the train operators run more trains across Great Britain than are run in most European countries - almost 20% more than in France and 60% more than in Italy.
  • Great Britain's 24,000 trains per-day is also more than Spain, Switzerland, the Netherlands, Portugal and Norway combined

Contact information

Passengers / community members
Network Rail national helpline
03457 11 41 41

Latest travel advice
Please visit National Rail Enquiries

Journalists
Network Rail press office - National
020 3356 8700
mediarelations@networkrail.co.uk

About Network Rail

We own, operate and develop Britain's railway infrastructure; that's 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We run 20 of the UK's largest stations while all the others, over 2,500, are run by the country's train operating companies.

Usually, there are almost five million journeys made in the UK and over 600 freight trains run on the network. People depend on Britain's railway for their daily commute, to visit friends and loved ones and to get them home safe every day. Our role is to deliver a safe and reliable railway, so we carefully manage and deliver thousands of projects every year that form part of the multi-billion pound Railway Upgrade Plan, to grow and expand the nation's railway network to respond to the tremendous growth and demand the railway has experienced - a doubling of passenger journeys over the past 20 years.

Follow us on Twitter: @networkrail
Visit our online newsroom: www.networkrailmediacentre.co.uk