More than nine in ten trains will run as normal this Easter – with engineering works set to take place in Kent and south east London: Parks Bridge Junction, Lewisham awaiting top stone cropped

Monday 9 Mar 2026

More than nine in ten trains will run as normal this Easter – with engineering works set to take place in Kent and south east London

Region & Route:
Southern
| Southern: Kent

While most trains will operate as normal over the Easter weekend, essential engineering work will take place in Thanet, between Ashford and Dover, and in south-east London.

Passengers are urged to plan ahead this Easter while essential engineering work takes place across Kent and south east London, although more than 90% of the railway will remain open. 

Engineers will complete a wide range of essential upgrades to maintain the safe and reliable running of the railway. Works will support long-term reliability, improve track condition, renew signalling equipment and strengthen bridges, cuttings and stations across the network in Kent and south-east London.

Travel advice for customers

Good Friday
Friday 3 April

We'll be running our Saturday timetable except for lines affected by engineering work.

Buses will replace trains between:

·       Herne Bay and Ramsgate

Some off-peak journeys between Faversham and St Pancras will not run.

Off-Peak fares will apply all day.

Saturday 4 April

We'll be running our normal Saturday timetable except for lines affected by engineering work.

Buses will replace trains between:

·       Herne Bay and Ramsgate

·       Orpington and Tonbridge

Some off-peak journeys between Faversham and St Pancras will not run.

Easter Sunday

Sunday 5 April

We'll be running our normal Sunday timetable except for lines affected by engineering work.

Buses will replace trains between:

·       Herne Bay and Ramsgate

·       Orpington and Tonbridge

·       Ashford International and Dover Priory

·       Barnehurst / Crayford and Dartford

·       Slade Green and Gravesend

·       Lewisham and Hayes

Easter Monday

Monday 6 April

We'll be running our normal Saturday timetable except for lines affected by engineering work.

Buses will replace trains between:

·       Herne Bay and Ramsgate

Some off-peak journeys between Faversham and St Pancras will not run.

Off-Peak fares will apply all day.

David Davidson, chief operating officer for the South Eastern Railway, said: “This Easter, the vast majority of the railway in the south east will remain open, but there will be a small number of temporary closures in east Kent, south east London, along the Tonbridge route and the line between Ashford and Dover.  

“These upgrades are crucial. Renewing worn infrastructure, improving track quality and boosting the resilience of our network will mean that our passengers can count on smoother, more reliable journeys for years to come. 

“Trains will continue to run and where routes are affected, we will have accessible replacement buses ready, and ticket acceptance in place to keep customers moving. 

“I want to thank all of our passengers for their patience and understanding as we carry out this vital investment to keep our railway moving forward.” 

Planned engineering work

Over the Easter weekend, engineers will:

In Thanet:

  • install over 820 yards of new track at Margate station 
  • replace timbers and ballast – the small stones underneath the track - and repair the steelwork of the central span of the St Peter’s Road railway bridge in Broadstairs 

In south-east London:

  • continue the long-term upgrade of signals in the Lewisham area, with the installation of new signalling equipment – the railway’s traffic light systems - at Ladywell Junction. 
  • undertake maintenance of the track at Elmers End and repair the roof canopy at Eden Park station in south-east London. 

At Hildenborough:

  • undertake track maintenance and drainage repairs at the Hildenborough cutting on the Chislehurst to Orpington/Tonbridge line, a location prone to flooding. A significant flood in October 2024 caused 2,776 minutes of delays to customers. 

Between Ashford International and Dover Priory:

  • undertake track maintenance between Ashford International and Dover, including repairs to the points at Saltwood Junction, work on the electric ‘third’ rail and install new rails through the Shakespeare Tunnel.

At Dartford:

  • undertake follow up work after the replacement of switches and crossings (otherwise known as ‘points’ which allow trains to move from one track to another) that was completed in a major upgrade in February.  

Contact information

Passengers / community members
Network Rail national helpline
03457 11 41 41

Latest travel advice
Please visit National Rail Enquiries

Journalists
Paul Prentice
Communications Manager
07354 529345
paul.prentice@networkrail.co.uk

About Network Rail

We own, operate and develop Britain's railway infrastructure; that's 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We run 20 of the UK's largest stations while all the others, over 2,500, are run by the country's train operating companies.

Usually, there are almost five million journeys made in the UK and over 600 freight trains run on the network. People depend on Britain's railway for their daily commute, to visit friends and loved ones and to get them home safe every day. Our role is to deliver a safe and reliable railway, so we carefully manage and deliver thousands of projects every year that form part of the multi-billion pound Railway Upgrade Plan, to grow and expand the nation's railway network to respond to the tremendous growth and demand the railway has experienced - a doubling of passenger journeys over the past 20 years.

Follow us on Twitter: @networkrail
Visit our online newsroom: www.networkrailmediacentre.co.uk