Friday 6 Dec 2024
Level crossing barrier in Cumbria destroyed by van bash
- Region & Route:
- North West & Central
- | North West & Central: North West
A level crossing in Maryport, Cumbria, will take days to fix after a van driver tried to beat the barrier.
Railway workers attended the scene today (Friday 6 January) to find the three-metre-long level crossing barrier strewn across the road after a motorist drove through the crossing.
The crossing keeps motorists and pedestrians safe from the tracks when trains are passing through. A red light is shown as the barriers close around 60 seconds before trains speed past at up to 60 mph.
The crossing will take days to repair, and is likely to cost the taxpayer up to £20,000.
Trains are still able to run along the Cumbrian Coast line, as the crossing’s traffic light system can warn cars and pedestrians when it is safe to cross. Motorists and pedestrians should carefully follow the warning system when using the crossing.
Wendy Potter, Network Rail’s operations manager for Cumbria, said: “Crossing the tracks in your vehicle when the safety barriers are down is extremely dangerous. I urge all drivers to respect safety warnings at level crossings, ignoring them could be fatal.
“It is going to take us days to repair the crossing, which means we need additional staff on site to help people safely over the railway.
“You can’t beat the barrier. Please, if the barriers are down and the red light is showing, do not attempt to cross the tracks.”
More information about level crossing safety can be found on the Network Rail website.
Contact information
Passengers / community members
Network Rail national helpline
03457 11 41 41
Latest travel advice
Please visit National Rail Enquiries
Journalists
Network Rail press office - North West & Central Region
0330 854 0100
NWCmediarelations@networkrail.co.uk
About Network Rail
We own, operate and develop Britain's railway infrastructure; that's 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We run 20 of the UK's largest stations while all the others, over 2,500, are run by the country's train operating companies.
Usually, there are almost five million journeys made in the UK and over 600 freight trains run on the network. People depend on Britain's railway for their daily commute, to visit friends and loved ones and to get them home safe every day. Our role is to deliver a safe and reliable railway, so we carefully manage and deliver thousands of projects every year that form part of the multi-billion pound Railway Upgrade Plan, to grow and expand the nation's railway network to respond to the tremendous growth and demand the railway has experienced - a doubling of passenger journeys over the past 20 years.
Follow us on Twitter: @networkrail
Visit our online newsroom: www.networkrailmediacentre.co.uk