Engineers working to repair a huge landslip at Hook in Hampshire will temporarily remodel undamaged track to give passengers a better train service while long-term repairs continue.

The slip, on an embankment to the northeast of Hook station, has left only two tracks of the four-track railway passable by trains, with both tracks designed to be used by London-bound trains only.

Network Rail will close the railway, between Basingstoke and Woking, this weekend to allow engineers to reconfigure the track layout and bypass the landslip.

Network Rail Wessex Route Director Mark Killick said: “We’re going to move the track onto a stable section of the embankment so that we can have a line running in each direction.

“While it’s a very unusual approach to change the track layout, it means we can run more trains and give customers a much better experience while we fix the embankment.

“The only downside is that we will need to close the railway again once the embankment is repaired to restore the track layout to its original position, but it’s gives the least disruptive solution for our customers.

“In the meantime, we will be able to continue the embankment repairs, while running a significantly improved train service. We’ll have hundreds of engineers working round the clock, but we still expect the fix to take a number of weeks, as it’s a very complex engineering project.

“We’ll update customers with a more definitive timescale to reopen all four lines as soon as we can.”

Working with our colleagues at South Western Railway, after this weekend’s works, we will be able to offer a significantly improved service which will restore crucial transport links that have been cut off since the weekend.

It also means trains can serve all stations again, with the exception of Hook station where trains travelling towards Basingstoke will not be able to stop due to the position of the landslip.

The landslip is in a remote location, engineers needed to build a 580-metre-long access road across fields to get materials and machinery to the site.

Engineers will construct a 60-metre retaining wall, made up of almost one hundred 12-metre long ‘sheet piles’ which are driven into the ground to stabilise the embankment and protect the railway from future landslips. They will also regrade the steepness of the embankment slope to reduce the risk of material falling. 

Mark added: “I’d like to say how sorry I am for the disruption our customers are facing. We’re working round the clock to fix the railway as quickly and safely as possible.

“Thank you in advance to the people who live nearby while we carry out the repairs, they’ve been very understanding and supportive.”

Claire Mann, South Western Railway's managing director, said: “We are very sorry for the ongoing disruption due to the landslip at Hook on Saturday 14, which has meant a severely reduced service on one of the country’s busiest railway lines.

“We know how frustrating this week has been for our customers, particularly those in the Hook, Winchfield, and Fleet areas, with trains unable to stop at these stations.

“Our colleagues at Network Rail are working around the clock and their work over the weekend means we will be able to reinstate direct services from London to Exeter and Weymouth on Monday 23, albeit with a reduced frequency.

“Until these initial works by Network Rail are completed, we must urge customers to only travel if absolutely necessary between Basingstoke and Woking. We would like to thank customers for their patience and understanding.”

Notes to Editors

  • The railway through Hook was built 130 years ago, out of London clay, which is notoriously unsuitable for building railways on. Unfortunately, they didn’t know that then, and our passengers are suffering the consequences.
  • Clay absorbs water, rather than draining, which makes it vulnerable to prolonged very wet weather and freezing conditions.
  • In the Southern region, we’ve suffered more than 200 earthworks failures in the past three years alone, and 25 of those have resulted in big line closures that have disrupted passengers. They’re becoming more and more frequent due to climate change. The Met Office says the UK has suffered 7 of its 10 wettest years on record since 1998, and more rain means more landslips.
  • The Southern Region looks after earthworks that if joined together would stretch all the way from Lands End to John O Groats. We have a £500 million pound five-year budget to look after those earthworks.
  • To rebuild or strengthen all of our earthworks would cost billions of pounds and close stretches of railway for very long periods. So we focus on examinations so we know where to repair and mitigate, carry out regular drainage inspections and maintenance so the water can flow away and reduce the risk, and in some locations install electronic devices into the ground which monitor movement and send alerts if there is a landslip so we can close the line and keep passenger safe.
  • We can regrade cuttings to make them less steep and more stable, but if we can’t do that in some locations we can build retaining walls or rock netting to stop mud falling onto the tracks. For embankments, we also regrade slopes or build walls at the bottom to keep them stable. 

Contact information

Passengers / community members
Network Rail national helpline
03457 11 41 41

Latest travel advice
Please visit National Rail Enquiries

Journalists
Tala Ghannam
Media Relations Manager (Campaigns) - National
Network Rail
07548 108907
tala.ghannam2@networkrail.co.uk

About Network Rail

We own, operate and develop Britain's railway infrastructure; that's 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We run 20 of the UK's largest stations while all the others, over 2,500, are run by the country's train operating companies.

Usually, there are almost five million journeys made in the UK and over 600 freight trains run on the network. People depend on Britain's railway for their daily commute, to visit friends and loved ones and to get them home safe every day. Our role is to deliver a safe and reliable railway, so we carefully manage and deliver thousands of projects every year that form part of the multi-billion pound Railway Upgrade Plan, to grow and expand the nation's railway network to respond to the tremendous growth and demand the railway has experienced - a doubling of passenger journeys over the past 20 years.

Follow us on Twitter: @networkrail
Visit our online newsroom: www.networkrailmediacentre.co.uk