Friday 20 Nov 2026
Bridge strike damage prompts urgent closure of A4010 near High Wycombe
- Region & Route:
- North West & Central
- | North West & Central: Central
Road users are being urged to plan ahead as the A4010 Bradenham Road near High Wycombe closes next week for urgent repairs to a damaged railway bridge.
The bridge has been damaged after being struck by vehicles, despite it's warning signs and height restrictions which are clearly visible to drivers.
It will be closed from Monday 23 November to Friday 11 December inclusive, with reopening expected on Saturday 12 December. Engineers will carry out extensive repair work to damaged brickwork on the railway bridge which carries the Chiltern main line between High Wycombe and Princes Risborough.
A full closure is needed as scaffolding and specialist equipment, including temporary structural supports, have to be used throughout and needs to be positioned within the carriageway while the work takes place. Train services will not be disrupted during the work.
Network Rail is working closely with Buckinghamshire Council on the temporary road closure, and with the nearby school and residents to help reduce the impact of it on local journeys.
Road users are advised to plan ahead, allow extra time and follow the clearly signed diversion routes which will be in place for all traffic during the closure.
Adam Checkley, engineering director at Network Rail, said: “We’re sorry for the disruption this closure will cause and understand the impact it will have on people who regularly use the A4010.
“These repairs are critical. Closing the road is the only way we can safely position the equipment needed to repair the damage caused by these bridge strikes.
“We’ll work as quickly and safely as possible to repair the bridge and reopen the road. Please allow extra time for your journey and follow the signed diversion.
“This is a reminder of why drivers of large vehicles must know their vehicle’s height and check their route before setting off to avoid unnecessary damage to bridges and the subsequent delay and disruption to local communities.”
Details of the repairs are being announced during Road Safety Week, following Network Rail’s publication of Britain’s ten most-bashed railway bridges and its renewed call for drivers and transport operators to ‘Wise Up, Size Up’.
Network Rail recorded 1,706 bridge strikes in 2025/26, equivalent to around one every five hours. The incidents caused 185,319 minutes of delays to rail passengers and cost around £13.25 million in delays, cancellations and repairs.
Drivers are being urged to know the height and width of their vehicles, check their planned route is suitable, and pay close attention to bridge height restrictions to help prevent similar incidents.
More advice for drivers and operators is available through Network Rail’s Wise Up, Size Up campaign.
Notes to Editors
- While there will be no access through the closure for motorists, cyclists or pedestrians, access for emergency services around the work will be facilitated whenever it is safe to do so.
- Clearly signed diversion routes will be in place for all traffic during the closure via A4010, A413, A404 and vice versa. Road users can check the latest information about roadworks and closures on Buckinghamshire Council’s roadworks and closures webpage.
- Bus service 130 will run to a temporary timetable during the closure, with diversions and some stops not served. Passengers should check the temporary timetable published by Buckinghamshire Council before travelling.
Contact information
Passengers / community members
Network Rail national helpline
03457 11 41 41
Latest travel advice
Please visit National Rail Enquiries
Journalists
Sophie Dangerfield
Senior Communications Manager - Central route
Network Rail
0330 8540100 (Option 2)
sophie.dangerfield@networkrail.co.uk
About Network Rail
We own, operate and develop Britain's railway infrastructure; that's 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We run 20 of the UK's largest stations while all the others, over 2,500, are run by the country's train operating companies.
Usually, there are almost five million journeys made in the UK and over 600 freight trains run on the network. People depend on Britain's railway for their daily commute, to visit friends and loved ones and to get them home safe every day. Our role is to deliver a safe and reliable railway, so we carefully manage and deliver thousands of projects every year that form part of the multi-billion pound Railway Upgrade Plan, to grow and expand the nation's railway network to respond to the tremendous growth and demand the railway has experienced - a doubling of passenger journeys over the past 20 years.
Follow us on Twitter: @networkrail
Visit our online newsroom: www.networkrailmediacentre.co.uk