Region detail
Latest news for this route

Last week to have your say on Tram Train stop and Park & Ride plans
People are being reminded to have their say on proposals for a new Tram Train stop and Park & Ride in Templeborough, Rotherham, before a public consultation on the scheme closes on Friday 3 September 2021.

Key rail route to North Wales to be protected from flash flooding
Rail passengers on a key route connecting North Wales to the North West will soon benefit from railway lines which are better protected from flash flooding.

Bryony Gordon, Rebecca Adlington, Jason Fox and Dr Rupy Aujla among the star line-up for Rail Wellbeing Live 2021
- Registration has opened for Rail Wellbeing Live, the rail industry’s biggest free wellbeing event, which returns on 17 to 18 November
- More than 100 speakers and 75 pick ‘n’ mix free sessions to choose from
- New for 2021: 10pm evening sessions to attract frontline workers; and opportunity to nominate colleague for Wellbeing Hero Award.

Passengers reminded to check before travelling as wheel timber renewals between Ely and Peterborough recommence this September
Rail passengers travelling between Ely and Peterborough will benefit from a more reliable service following a programme of wheel timber renewals across four bridges near Manea, starting Saturday 11 September 2021.

Package of essential rail works starts this month to improve reliability between Norwich and London
Network Rail will carry out essential track and maintenance works between Marks Tey and Chelmsford on the busy London to Norwich main line on some weekends in September, October and November.

Central station tours reopen with Glasgow School of Art onboard
Much-loved behind-the-scenes tours of Glasgow Central station are about to restart following lockdown and now feature a brand-new underground museum, created in partnership with The Glasgow School of Art.

Over £1.8 billion spent across the south on improvements with passengers returning to the railway more than 18 months after the first lockdown, Network Rail’s Wessex route says “welcome back”
- Network Rail Wessex route, which maintains and operates tracks from Waterloo to Surrey, Hampshire, Dorset, and Wiltshire, spent almost £580m maintaining and upgrading the railway during lockdown, so passengers came back to a better railway
- Enhancements worth nearly £60m included upgrades to track and signalling at Guildford station, Southampton, and the Heart of Wessex line
- Passengers welcomed back with enhanced cleaning and advised to wear masks in crowded stations.

Over £1.8 billion spent across the south on improvements with passengers returning to the railway more than 18 months after the first lockdown, Network Rail’s Sussex route says “welcome back”
- Network Rail Sussex route, which maintains and operates tracks from London Victoria and London Bridge to commuter towns of south London, parts of Surrey, Croydon and Brighton, spent over £643m maintaining and upgrading the railway during lockdown, so passengers came back to a better railway
- Enhancements worth over £150m included the continued work to upgrade Gatwick and Crawley stations
- Passengers welcomed back with enhanced cleaning and advised to wear masks in crowded stations.
Results 3489 - 3496 out of 14665