Region detail
Latest news for this route

Extremely limited trains north of York during rail strikes
- Rail passengers will not be able to travel north of York on Saturday 1 October or north of Newcastle on Saturday 8 October amid national strike action
- Passengers should plan ahead between Saturday 1 and Sunday 9 October
- A severely reduced timetable will operate on Wednesday 5 October between 7:30am and 6:30pm

Safety improvements in Bath protect both the railway and a bit of history
Network Rail has completed essential safety improvement work to the iconic low balustrade wall at Sydney Gardens in Bath, including the installation of railings to prevent trespassers from being able to gain access to the track.

Strike day timetable published for Saturday as passengers reminded to only travel by train if absolutely necessary
- With the RMT, Aslef and TSSA coordinating strike action on Saturday 1 October, only around 11% of services will operate, and there will be no trains at all across significant parts of the country
- Trains that do run will start later and finish much earlier than usual, so passengers are asked to only travel by rail if absolutely necessary. Those who must travel should expect disruption, plan ahead and check when their last train will depart
- Train drivers at 14 operators are also walking out on Wednesday 5 October, meaning disruption for passengers on those routes
- The RMT is then staging another walkout on Saturday 8 October
- Timetable for the Aslef strike on 5 October will be published on National Rail Enquiries later this week, while the timetable for Saturday 8 October will be published early next week

Platform removal clears way for double tracking at Cameron Bridge
Work to demolish the old station platforms at Cameron Bridge is now complete.

Network Rail and housing charity Shelter expand pioneering rough sleeping pilots into London Charing Cross and London Victoria stations
Some of Network Rail’s busiest London stations have teamed up with housing and homelessness charity Shelter to help people sleeping rough.

VIDEO: Line reopens between Axminster and Pinhoe, after engineers make great progress on landslip prevention work in Honiton, in Devon
Network Rail thanks customers for their patience after five days of work protecting the railway from landslips on the West of England line between Axminster and Pinhoe.

Further rail changes between King's Lynn, Cambridge and London for track repairs
Further changes are being introduced on the rail route between King's Lynn, Cambridge and London King's Cross from Monday 26 September, while work takes place to repair track defects caused by the recent heatwave.

Hedgehog highway plan on track in Glasgow’s southside.
Network Rail has completed one mile of boundary fencing renewals with a difference on Glasgow’s south side.
Results 2369 - 2376 out of 14368