The South West

This area includes the Great Western Main Line and its branches, covering the route from London Paddington to Penzance, through Bristol and onto Pilning, up to the boundaries with Wales, Worcester and Basingstoke. It operates and maintains over 900 miles of track, enabling the running of over 2,000 services a day. Train operators include Great Western Railway, South West Railway, CrossCountry, Chiltern Railways and Heathrow Express.
Latest news for this route

Passengers advised to check before they travel ahead of Bath Spa upgrade
Passengers travelling to or from Bath Spa station are advised to check before they travel as Network Rail are set to start a £15m upgrade this weekend which will allow for new larger more comfortable trains to call at the station from later this year.

£15m Easter modernisation work to bring major improvements for rail passengers in Bath
A major programme of work to modernise the Great Western Mainline this Easter will see platforms at Bath Spa station widened in preparation for longer trains providing over a fifth more seats for passengers.

New trains on the way as Thames Valley electrification reaches major milestone
- Network Rail successfully electrifies 12 miles of railway from Maidenhead to Stockley Junction as part of the Crossrail project
- New electric infrastructure in the Thames Valley allows for the introduction of new Great Western Railway (GWR) trains in May and the Elizabeth line from 2019
- Click here to download images of the work; click here to view a short video

Swindon residents invited to drop-in event to find out more about railway upgrade work
Residents living near Roman Road bridge in Swindon have been invited to a drop-in event to find out more about upcoming work to prepare the Great Western Main Line for electrification. This forms part of Network Rail’s Railway Upgrade Plan to provide a bigger, better, more reliable railway for passengers.

Oxford residents invited to find out more about railway upgrade work
Residents of Oxford have been invited to find out more about upcoming work to improve the movement of trains and passengers through the area.

Final stage of railway vegetation clearance in the Falmouth area
The final stage of work to clear vegetation near the railway between Penryn and Falmouth is set to take place later this month, completing a six-month period of work to make the railway safer and more efficient.

Event for residents near Bristol Parkway on next steps to provide new and better trains to the area
Residents living near Bristol Parkway station have been invited to a drop-in event to find out more about upcoming work to prepare the Great Western Main Line for electrification as part of Network Rail’s Railway Upgrade Plan to provide a bigger, better, more reliable railway for passengers.

Industry collaboration sees Southall’s Merrick Road footbridge moved to new home at Didcot Railway Centre
After two years in the planning, Network Rail, its principal contractor Taylor Woodrow and their subcontractor Murphy, successfully dismantled the remaining spans of Southall’s iconic Merrick Road footbridge, preparing it for its new life at Didcot Railway Centre.
Results 561 - 568 out of 1170