Press office main switchboard: 0330 854 0100 (Answered 9am-5pm Monday to Friday) then select:
Option 1 for West Coast Main Line (Euston to Crewe)
Option 2 for West Midlands and Chiltern Line
Option 3 for North West
Urgent out-of-hours: 0330 333 1800
This area runs from London Euston in the south, through the West Midlands, the north west of England and Cumbria before joining with Scotland at Gretna. It is home to the West Coast Main Line, the busiest mixed use railway in Europe and the main long distance route between England Scotland. It supports the major British cities outside of London – including Birmingham, Manchester and Liverpool, as well as several smaller cities such as Wolverhampton, Stoke, Coventry and Carlisle. Train operators on the route include Avanti West Coast, West Midlands Trains, London North Western, CrossCountry, East Midlands Trains, Southern (GTR), Merseyrail, Northern, TransPennine Express, London Overground, Transport for Wales Rail and Chiltern Railways.
Passengers in Merseyside are benefiting from a major investment to Bromborough station on the Wirral as the region’s railway network evolves for the future.
Passengers using the West Coast main line between Crewe and London Euston should plan ahead if using the railway during the government’s Christmas travel window between 23 and 27 December
People should reserve seats on long distance trains, travel at quieter times and follow all safety advice to stop the spread of coronavirus
Railway improvement work is taking place to improve future journeys on one of Europe’s busiest mixed-use passenger and freight routes
Passengers in Greater Manchester, Liverpool, Lancashire and Cumbria should plan ahead if using the railway during the government’s Christmas travel window between 23 and 27 December
People should reserve seats on long distance trains, travel at quieter times and follow all safety advice to stop the spread of coronavirus
Railway upgrades in the North West over Christmas include new track, overhead electric lines and bridge work to improve future journeys for passengers
Chiltern main line and West Midlands passengers should plan ahead if using the railway during the government’s Christmas travel window between 23 and 27 December
People should reserve seats on long distance trains, travel at quieter times and follow all safety advice to stop the spread of coronavirus
Railway improvements include ongoing work at Birmingham New Street station as part of major signalling upgrade on 25 and 26 December
Laser scanners and drones have been used to map every inch of the iconic Ribblehead viaduct as part of a major restoration project to secure its future for passengers and tourists.