Pictures & videos

Final set of S&C

Final set of S&C

Friday 1 Dec 2017
The final of 154 sets of points is installed on the tracks to the east of London Bridge station, which will connect line 4 to the flyover at Bermondsey.
PointsandShard

PointsandShard

Friday 1 Dec 2017
The new switches and crossings units can be seen on the new tracks approaching London Bridge station and The Shrd
Railwork077

Railwork077

Friday 1 Dec 2017
Network Rail engineers on the tracks near London Birdge
Railwork024

Railwork024

Friday 1 Dec 2017
An S&C unit on the tracks near London Bridge
Mark Somers

Mark Somers

Friday 1 Dec 2017
Mark Somers, railway systems project director for Network Rail's Thameslink Programme
The Economy Infrastructure and Skills Committee at the Pierhead event

The Economy Infrastructure and Skills Committee at the Pierhead event

Friday 1 Dec 2017
The Economy Infrastructure and Skills Committee at the Pierhead event pictured here with Lynne Milligan, customer services director for Arriva Trains Wales (third left), Pete Waterman (fourth left) Bill Kelly, chief operating officer for Network Rail in Wales and Borders (third right) and Sir Peter Hendy, CBE, Chair of Network Rail (second right)