Pictures & videos
Final set of S&C
Friday 1 Dec 2017
The final of 154 sets of points is installed on the tracks to the east of London Bridge station, which will connect line 4 to the flyover at Bermondsey.
PointsShardTrain
Friday 1 Dec 2017
The tracks are now complete around London Bridge station
PointsandShard
Friday 1 Dec 2017
The new switches and crossings units can be seen on the new tracks approaching London Bridge station and The Shrd
Lines 3&4 London Bridge
Friday 1 Dec 2017
Track renewal on the lines to the east of London Bridge
Railwork024
Friday 1 Dec 2017
An S&C unit on the tracks near London Bridge
LondonBridgeTrackNov
Tuesday 21 Nov 2017
The tracks approaching London Bridge are now complete. Lines 1-5 through London Bridge will be commissioned on 2 January 2018.
London Bridge sunrise
Tuesday 21 Nov 2017
The sun rises over London Bridge station, with the Shard to the right of the picture.
Completed new tracks to the east of London Bridge
Tuesday 21 Nov 2017
The new tracks approaching London Bridge from the east have now been laid, ahead of Christmas and New Year when the new lines will be commissioned.
Results 1 - 8 out of 126