Pictures & videos

Sleepers lifted into place LBG

Sleepers lifted into place LBG

Monday 10 Apr 2017
Sleepers lifted into place just outside platforms 1 and 2 at London Bridge station. These will form part of the new lines 1 and 2 due to be commissioned over the Easter weekend.
NTC at LBG

NTC at LBG

Monday 10 Apr 2017
The New Track Construction (NTC) train lays the new track that will be line 2 at London Bridge, ahead of commissioning over the Easter weekend.
New escalators LBG

New escalators LBG

Monday 10 Apr 2017
Two new escalators are installed in the final section of the new, street-level concourse at London Bridge, due to open in January 2018.
Sleepers lifted into place at LBG

Sleepers lifted into place at LBG

Monday 10 Apr 2017
Sleepers are lifted into place just outside platforms 1 and 2 at London Bridge station. These will form part of the new lines 1 and 2 due to be commissioned over the Easter weekend.
New tracks on lines 1 & 2

New tracks on lines 1 & 2

Wednesday 15 Mar 2017
The new tracks have been laid on lines 1 & 2 through London Bridge ahead of commissioning over the Easter weekend.
NTC at London Bridge

NTC at London Bridge

Wednesday 15 Mar 2017
The New Track Construction (NTC) machine laying the new tracks through lines 1 and 2 at London Bridge, ahead of commissioning over the Easter weekend.
Platforms 3 & 4 March

Platforms 3 & 4 March

Wednesday 15 Mar 2017
Platforms 3 and 4 at London Bridge are taking shape. They will come into passenger use in January 2018.
Tooley St facade March '17

Tooley St facade March '17

Wednesday 15 Mar 2017
Progress is being made on the new facade that will be part of the Tooley Street entrance to London Bridge
Platforms 2 and 3 London Bridge

Platforms 2 and 3 London Bridge

Monday 27 Feb 2017
Construction is underway on platforms 2 and 3 at London Bridge ahead of January 2018 when the remaining platforms and section of the concourse will open to the public.
London Bridge concourse foundations

London Bridge concourse foundations

Monday 27 Feb 2017
Final preparations are made on the foundations of the remaining section of London Bridge's street level concourse, ahead of one of the last concrete pours.
LB 180

LB 180

Monday 5 Dec 2016
Part of the mini-museum at London Bridge
Station staff

Station staff

Monday 22 Aug 2016
Station staff assist a woman at the new London Bridge station
London Bridge August 2015

London Bridge August 2015

Tuesday 1 Sep 2015
Welding lengths of conductor rail together on site at London Bridge for the Thameslink Programme
London Bridge August 2015

London Bridge August 2015

Tuesday 1 Sep 2015
Crushed stones - ballast - are dropped at London Bridge to form the base for new track as part of the Thameslink Programme
London Bridge August 2015

London Bridge August 2015

Tuesday 1 Sep 2015
Southwark Cathedral keeps an eye on Network Rail's tilting wagons - carryring sets of points for Thameslink Programme work at London Bridge
London Bridge August 2015

London Bridge August 2015

Tuesday 1 Sep 2015
The Shard looms over rail workers working on the viaduct at Ewer Street, Southwark, putting in a new set of points for the Thameslink Programme
London Bridge August 2015

London Bridge August 2015

Tuesday 1 Sep 2015
A rail worker delivers new conductor rail to site at London Bridge, using a piece of equipment called an "Iron Man". All part of the Thameslink Programme
St Thomas St - London Bridge

St Thomas St - London Bridge

Thursday 20 Aug 2015
London Bridge station - St Thomas Street pre-cast facade is moved into place. Part of the Thameslink Programme
St Thomas St - London Bridge

St Thomas St - London Bridge

Thursday 20 Aug 2015
London Bridge station - St Thomas Street facade under construction with the Shard towering over it. Part of the Thameslink Programme
New Shard Forecourt, London Bridge station

New Shard Forecourt, London Bridge station

Tuesday 11 Aug 2015
A new image showing the The Shard concourse and piazza at London Bridge station as it will be when Thameslink completes in 2018, with new retail, bars and cafes, more space and more light
Three Bridges ROC - London Bridge workstation

Three Bridges ROC - London Bridge workstation

Monday 20 Jul 2015
London Bridge south side signalling workstation - one of two that control that area. Work is split between New Cross Gate and London Bridge itself. Based at Three Bridges Rail Operating Centre after Thameslink Programme moved them from London Bridge box itself.
Three Bridges ROC - London Bridge south side signalling workstation

Three Bridges ROC - London Bridge south side signalling workstation

Monday 20 Jul 2015
London Bridge south side signalling workstation - one of two that control that area. Work is split between New Cross Gate and London Bridge. Based at Three Bridges Rail Operating Centre after Thameslink Programme moved them from London Bridge box itself. Left to right and top to bottom: telephone display including GSMR, route overview, TRUST screen showing train times, London Bridge route overview and then signalling display.

Results 1 - 50 out of 92