Pictures & videos
Hitchin crossovers
Thursday 31 Mar 2011
This photo illustrates the path Cambridge services have to negotiate upon leaving Hitchin station - crossing the East Coast Main Line to join the branch line slightly further up the tracks.
Hatfield Colliery spoil heap slip – effect upon engineering works
Wednesday 12 Jun 2013
Document outlining some of the changes made to engineering works as a result of the prolonged disruption at Hatfield & Stainfortnh caused by the spoil heap slip in Fenruary 2013
Shallowford newt works, picture 2
Thursday 23 May 2013
Shallowford newt works, picture 2
Stratton Green bridge in Swindon
Tuesday 9 Sep 2014
Stratton Green bridge in Swindon before the work to prepare it for electrification.
The installation of a new stepped-footbridge with ramps at Severn Tunnel Junction station means that for the first time passengers will have a step-free route between all four platforms.
Monday 26 Jan 2015
The installation of a new stepped-footbridge with ramps at Severn Tunnel Junction station means that for the first time passengers will have a step-free route between all four platforms.
Finishing touches put to the new platforms (10 and 11) at London Bridge
Wednesday 17 Dec 2014
Finishing touches put to the new platforms (10 and 11) at London Bridge - part of the Thameslink Programme
Results 15641 - 15648 out of 18572