Pictures & videos
Final set of S&C
Friday 1 Dec 2017
The final of 154 sets of points is installed on the tracks to the east of London Bridge station, which will connect line 4 to the flyover at Bermondsey.
PointsShardTrain
Friday 1 Dec 2017
The tracks are now complete around London Bridge station
PointsandShard
Friday 1 Dec 2017
The new switches and crossings units can be seen on the new tracks approaching London Bridge station and The Shrd
Lines 3&4 London Bridge
Friday 1 Dec 2017
Track renewal on the lines to the east of London Bridge
Results 9481 - 9488 out of 18604