Pictures & videos

Final set of S&C
Friday 1 Dec 2017
The final of 154 sets of points is installed on the tracks to the east of London Bridge station, which will connect line 4 to the flyover at Bermondsey.

PointsShardTrain
Friday 1 Dec 2017
The tracks are now complete around London Bridge station

PointsandShard
Friday 1 Dec 2017
The new switches and crossings units can be seen on the new tracks approaching London Bridge station and The Shrd
Results 9281 - 9288 out of 18407