Pictures & videos
NEW - St Thomas St facade CGI, London Bridge
Thursday 20 Aug 2015
Artist's impression of the new London Bridge station facade on St Thomas Street, part of the Thameslink Programme
NEW - St Thomas Street facade CGI - London Bridge
Thursday 20 Aug 2015
Artist's impression of the new London Bridge station facade on St Thomas Street, part of the Thameslink Programme
London Bridge - Shard Internal Concourse
Tuesday 11 Aug 2015
The Shard concourse at London Bridge station as it will be when Thameslink completes in 2018, with new retail, more space and more light
New Shard Forecourt, London Bridge station
Tuesday 11 Aug 2015
A new image showing the The Shard concourse and piazza at London Bridge station as it will be when Thameslink completes in 2018, with new retail, bars and cafes, more space and more light
Three Bridges ROC - London Bridge workstation
Monday 20 Jul 2015
London Bridge south side signalling workstation - one of two that control that area. Work is split between New Cross Gate and London Bridge itself. Based at Three Bridges Rail Operating Centre after Thameslink Programme moved them from London Bridge box itself.
Three Bridges ROC - London Bridge south side signalling workstation
Monday 20 Jul 2015
London Bridge south side signalling workstation - one of two that control that area. Work is split between New Cross Gate and London Bridge. Based at Three Bridges Rail Operating Centre after Thameslink Programme moved them from London Bridge box itself. Left to right and top to bottom: telephone display including GSMR, route overview, TRUST screen showing train times, London Bridge route overview and then signalling display.
Three Bridges ROC London Bridge signallers' workstation
Monday 20 Jul 2015
Close up of London Bridge south side on a WestCAD workstation. Based at Three Bridges Rail Operating Centre after Thameslink Programme moved them from London Bridge box itself.
Thameslink Programme - Old aerial picture of London Bridge (2013)
Thursday 16 Jul 2015
This is London Bridge as it was in summer 2013 - with construction centred on the south of the station (to the left of the picture). Thameslink Programme
Results 177 - 184 out of 292