Thursday 28 Mar 2013

Spoil recovery at Hatfield Colliery 27.3.13

Regions:

work continues to deal with 100 cubic metres of material

Download

27.3.13.JPG
816px * 612px
459.92 KB
Spoil recovery at Hatfield Colliery 27.3.13: work continues to deal with 100 cubic metres of material