Friday 7 Feb 2014

time lapse of modular polystyrene platform being installed as part of the Peterborough investment project

Regions:

installation of the 30 polystyrene blocks and matching concrete surface panels used to build the new platform and delivered in just 73 hours

Download

NR - Peterborough Intranet.mp4
21.84 MB