Wednesday 17 Dec 2014

Finishing touches put to the new platforms (10 and 11) at London Bridge

Regions:

Finishing touches put to the new platforms (10 and 11) at London Bridge - part of the Thameslink Programme

Download

London Bridge New Platforms 042.jpg
2056px * 2933px
2.05 MB
Finishing touches put to the new platforms (10 and 11) at London Bridge: Finishing touches put to the new platforms (10 and 11) at London Bridge - part of the Thameslink Programme