Wednesday 17 Dec 2014

Finishing touches put to the new platforms (10 and 11) at London Bridge

Regions:

Finishing touches put to the new platforms (10 and 11) at London Bridge - part of the Thameslink Programme

Download

London Bridge New Platforms 030.jpg
2432px * 3648px
3.21 MB
Finishing touches put to the new platforms (10 and 11) at London Bridge: Finishing touches put to the new platforms (10 and 11) at London Bridge - part of the Thameslink Programme