Tuesday 1 Sep 2015
London Bridge August 2015
- Regions:
Crushed stones - ballast - are dropped at London Bridge to form the base for new track as part of the Thameslink Programme
Tuesday 1 Sep 2015
Crushed stones - ballast - are dropped at London Bridge to form the base for new track as part of the Thameslink Programme