Monday 20 Jan 2014

The start of work to demolish a bridge as part of the Chase Line electrification is marked in Hednesford

Regions:

Download

hednesford bridge work group shot.jpg
4743px * 3162px
1.84 MB
The start of work to demolish a bridge as part of the Chase Line electrification is marked in Hednesford