Pictures & videos

Balham - resignalling-3
Tuesday 3 May 2016
Recovering old location cases, which once would have monitored trains through this section of railway

Balham - resignalling 2
Tuesday 3 May 2016
Cutting out an old signal, ready to be replaced by a lightweight, modern LED signal

Thameslink work (April 9 ) engineering train
Sunday 10 Apr 2016
Engineering train carrying spent ballast. Paul Clark monitors these for the Thameslink Programme

Paul Clark, Network Rail and Thameslink Programme
Sunday 10 Apr 2016
Paul Clark, Network Rail operations delivery manager, on site for the Thameslink Programme

Paul Clark, on site for Thameslink
Sunday 10 Apr 2016
Paul Clark, Network Rail operations delivery manager , on site for Thameslink

Paul Clark on site for Thameslink
Sunday 10 Apr 2016
Paul Clark on site for Thameslink

Thameslink april 9, skim dig
Sunday 10 Apr 2016
Work underway for the Thameslink Programme up on the viaduct at Southwark Park
Results 609 - 616 out of 920