Pictures & videos
SE Route Easter- Sevenoaks
Tuesday 18 Apr 2017
Burying the new drainage pipes in the depths of Sevenoaks Tunnel
SE Route Easter-Sevenoaks
Tuesday 18 Apr 2017
Unloading shingle to bury the drainage pipes in Sevenoaks Tunnel
SE Route Easter- Sevenoaks
Tuesday 18 Apr 2017
Massive fans keep air flowing int he 2 mile long Sevenoaks Tunnel
SE Route Easter- Thameslink
Tuesday 18 Apr 2017
End of the line! London Bridge. This will carry Thameslink trains from 2018 onwards
South East - Easter - Maidstone
Tuesday 18 Apr 2017
Uncovering a high-voltage cable run as part of cutting works in Maidstone
Maidstone - cutting works
Tuesday 18 Apr 2017
Reprofiling a cutting side in Maidstone
Working through sunset at London Bridge
Tuesday 18 Apr 2017
Working through sunset at London Bridge
South East - Easter - Picking up sleepers near London Bridge
Tuesday 18 Apr 2017
Picking up sleepers near London Bridge
Results 449 - 456 out of 923