Pictures & videos
Hitachi Traffic Management signing
Monday 27 Jul 2015
Hitachi Rail Europe MD Karen Boswell and Network Rail's Gary Porter celebrate signing the deal to provide Traffic Management to the Thameslink Programme. Also in the picture are the Network Rail and Hitachi teams who will make this all happen
hitachimodeloffice
Thursday 23 Jul 2015
Hitachi's Traffic Management model office in Holborn
Three Bridges ROC - London Bridge workstation
Monday 20 Jul 2015
London Bridge south side signalling workstation - one of two that control that area. Work is split between New Cross Gate and London Bridge itself. Based at Three Bridges Rail Operating Centre after Thameslink Programme moved them from London Bridge box itself.
Three Bridges ROC - London Bridge south side signalling workstation
Monday 20 Jul 2015
London Bridge south side signalling workstation - one of two that control that area. Work is split between New Cross Gate and London Bridge. Based at Three Bridges Rail Operating Centre after Thameslink Programme moved them from London Bridge box itself. Left to right and top to bottom: telephone display including GSMR, route overview, TRUST screen showing train times, London Bridge route overview and then signalling display.
Three Bridges ROC
Monday 20 Jul 2015
Three Bridges Rail Operating Centre, controlling parts of Sussex, London and the Thameslink Core
Three Bridges ROC - a controller's view
Monday 20 Jul 2015
Controller's-eye view of Three Bridges ROC
Three Bridges ROC London Bridge signallers' workstation
Monday 20 Jul 2015
Close up of London Bridge south side on a WestCAD workstation. Based at Three Bridges Rail Operating Centre after Thameslink Programme moved them from London Bridge box itself.
Results 689 - 696 out of 907