Pictures & videos

Piled wall Ockley awaiting backfilling
Monday 4 Jan 2021
Piled wall Ockley awaiting backfilling

Rail Wellbeing Live Coffee
Monday 28 Sep 2020
Rail Wellbeing Live Station Staf

Denmark Hill
Thursday 27 Aug 2020
Denmark Hill elevations

Logos on battery-powered train (IPEMU)
Monday 12 Jan 2015
The new train contributes to Network Rail’s commitment to reduce its environmental impact, improve sustainability and reduce the cost of running the railway by 20 per cent over the next five years. It could ultimately lead to a fleet of battery-powered trains running on Britain’s rail network which are quieter and more efficient than diesel-powered trains, making them better for passengers and the environment. Network Rail and its industry partners – including Bombardier, Abellio Greater Anglia, FutureRailway and the Rail Executive arm of the Department for Transport (which is co-funding the project) – recognise the potential for battery-powered trains to bridge gaps between electrified parts of the network and to run on branch lines where it would be too expensive to install overhead electrification.

A welder works through the night between London Bridge and Waterloo East
Monday 14 Sep 2015
A welder works through the night on Saturday, Sept 12, between London Bridge and Waterloo East. These crossovers will link trains from Charing Cross to the new Borough Viaduct

Bermondsey Part of the new dive under
Friday 17 Apr 2015
Part of the new dive under takes shape in Bermondsey, as part of the Thameslink Programme. This will have a single track on it before too long.

Easter works - London Bridge - new crossovers for new track
Tuesday 7 Apr 2015
Easter bank holiday 2015 - part of the Thameslink Programme
Results 849 - 856 out of 916