Tuesday 5 May 2009
New VDUs, Colchester signal box
- Regions:
New visual display units (VDUs) at the upgrade Colchester signal box. The box will control all signals and level crossings on the branch line from Colchester to Clacton-on-Sea and Walton-on-the-Naze once final commissioning takes place in summer 2009.
