Tuesday 29 Dec 2009
Christmas night, bridge is on site
- Regions:
The new bridge deck at Diss is in place after engineers worked through the night on Christmas Eve and through Christmas Day to remove the old bridge.
Tuesday 29 Dec 2009
The new bridge deck at Diss is in place after engineers worked through the night on Christmas Eve and through Christmas Day to remove the old bridge.