Tuesday 2 Jan 2007

Rugby Birdcage Bridge Removal

A 1200 tonne crane prepares to lift out a 350 tonne section of the redundant 'birdcage' bridge which spanned the West Coast Main Line at Rugby.

Rugby Birdcage Bridge Removal: A 1200 tonne crane prepares to lift out a 350 tonne section of the redundant 'birdcage' bridge which spanned the West Coast Main Line at Rugby.

Download "crane lift 1.jpg" (3072px * 2048px - 2.83 MB)