Sunday 1 May 2011

Borough Viaduct 2

Regions:

The uniquely-designed bridge is 72m long, six metres high and weighs 1,200 tonnes.  It took seven hours to move it into place, travelling at an average of 7mm per second using specialist machinery before being lowered into place, creating a new landmark.

Download

Borough 2.jpg
3780px * 2520px
1.76 MB
Borough Viaduct 2: The uniquely-designed bridge is 72m long, six metres high and weighs 1,200 tonnes.  It took seven hours to move it into place, travelling at an average of 7mm per second using specialist machinery before being lowered into place, creating a new landmark.