Sunday 1 May 2011

Borough Viaduct 1

Regions:

A striking new railway bridge is launched into place over Borough High Street over a single weekend (30 April - 1 May 2011) to play a vital role in increasing capacity, reducing delays and providing better connections for the 50m passengers who travel through London Bridge every year. - Thameslink

Download

Borough 1.jpg
3780px * 2520px
1.99 MB
Borough Viaduct 1: A striking new railway bridge is launched into place over Borough High Street over a single weekend (30 April - 1 May 2011) to play a vital role in increasing capacity, reducing delays and providing better connections for the 50m passengers who travel through London Bridge every year. - Thameslink