SIGNS UP FOR BROMSGROVE’S BRIDGE BASHERS: Interactive warning sign at Navigation bridge, Bromsgrove

Thursday 8 Nov 2007

SIGNS UP FOR BROMSGROVE’S BRIDGE BASHERS

Region & Route:

Rail passengers travelling between Birmingham, Worcestershire and the West Country are set to benefit following an initiative by Network Rail and Worcestershire County Council to reduce delays caused by high vehicles hitting railway bridges. New interactive signs have been installed at Vigo and Navigation bridges near Bromsgrove to reduce the number of times they are hit. In the past three years, ‘bridge strikes’ at these two locations have caused almost 9000 train delay minutes and cost the railway industry over £100,000. Consequences of a bridge strike can vary from minor paint scrapes, to major structural damage to the bridge and track being moved sideways by the impact. In some cases vehicles get stuck under the bridge themselves, also causing major delays for motorists. John Gill, Network Rail’s Area General Manager said: "Each time these bridges are hit, we have to close the railway until an engineer can examine the structure for any damage. This not only causes significant disruption for passengers but costs the railway industry thousands of pounds every year, money that would otherwise be used to improve services." By using vehicle-activated technology, the interactive signs warn drivers approaching the bridges from both sides if their vehicles are too tall and likely to strike the bridge. Councillor Derek Prodger, Worcestershire County Council’s Cabinet Member for Environment, added: "These signs, particularly the location of them, are important in addressing the hazard posed by high vehicles hitting railway bridges. These signs are a step in the right direction and I would welcome them not just being sited on bridges, but also along routes."

Notes to editors

In the last three years, high vehicles striking Vigo and Navigation bridges caused 8,745 train delay minutes at a cost of £102,928 The most recent strike happened at Vigo on 1 May 2007 delaying 19 trains by 210 minutes and costing the railway industry over £3,000 The signs at Navigation Bridge were funded by Network Rail and the signs at Vigo were jointly funded by Network Rail and Worcestershire County Council. Navigation Bridge, south of Bromsgrove spans the B4091 between Stoke Prior and Hanbury. The maximum permitted height for vehicles is 12’9” or 3.8m Vigo Bridge, north of Bromsgrove spans the B4096 between Burcot and Redditch. The maximum permitted height for vehicles is 11’9” or 3.5m

Contact information

Passengers / community members
Network Rail national helpline
03457 11 41 41

Latest travel advice
Please visit National Rail Enquiries

Journalists
Network Rail press office - North West & Central Region
0330 854 0100
NWCmediarelations@networkrail.co.uk

About Network Rail

We own, operate and develop Britain's railway infrastructure; that's 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We run 20 of the UK's largest stations while all the others, over 2,500, are run by the country's train operating companies.

Usually, there are almost five million journeys made in the UK and over 600 freight trains run on the network. People depend on Britain's railway for their daily commute, to visit friends and loved ones and to get them home safe every day. Our role is to deliver a safe and reliable railway, so we carefully manage and deliver thousands of projects every year that form part of the multi-billion pound Railway Upgrade Plan, to grow and expand the nation's railway network to respond to the tremendous growth and demand the railway has experienced - a doubling of passenger journeys over the past 20 years.

Follow us on Twitter: @networkrail
Visit our online newsroom: www.networkrailmediacentre.co.uk