Reminder of final road closure for restoration of Manchester city centre bridges: Aerial view of the Great Ducie Street and Victoria Street bridges before the overhaul

Friday 26 Apr 2019

Reminder of final road closure for restoration of Manchester city centre bridges

Region & Route:
North West & Central

Motorists are being reminded that a project to refurbish three historic railway bridges in Manchester city centre ramps up again next week.

The three Grade II listed structures over Great Ducie Street and Victoria Street, to the west of Manchester Victoria station, are being repaired, cleaned and painted as part of the Great North Rail Project.

The work will have an impact on road traffic through the area but trains will not be affected.

Scaffolding has been installed beneath and around the bridges, with the following road closures needed to complete the work safely.

  • Victoria Street will be fully closed to road traffic from 3 May to 20 May 2019.
  • Mirabel Street has been closed at the Victoria Street junction until the end of June 2019.

While diversions for traffic will be in place during the road closures, pedestrian access will not be affected and trains will continue to run as normal.

Sarah Padmore, scheme project manager for Network Rail, said: “As part of the Great North Rail Project, we are carrying out vital repair work to three bridge structures which support the railway on the western side of Manchester Victoria station.

“To safely access and repair sections of the bridges directly above the road, we need to close Victoria Street once more.

“I’d like to apologise for any inconvenience caused and thank local people and road users in advance for their patience while we deliver this essential work.”

The bridges are being grit blasted to expose the metal structures, allowing engineers to carry out vital repairs before repainting them to their Victorian splendour.

Contact information

Passengers / community members
Network Rail national helpline
03457 11 41 41

Latest travel advice
Please visit National Rail Enquiries

Journalists
Network Rail press office - North West & Central Region
07740 782954
NWCmediarelations@networkrail.co.uk

About Network Rail

We own, operate and develop Britain's railway infrastructure; that's 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We run 20 of the UK's largest stations while all the others, over 2,500, are run by the country's train operating companies.

Usually, there are almost five million journeys made in the UK and over 600 freight trains run on the network. People depend on Britain's railway for their daily commute, to visit friends and loved ones and to get them home safe every day. Our role is to deliver a safe and reliable railway, so we carefully manage and deliver thousands of projects every year that form part of the multi-billion pound Railway Upgrade Plan, to grow and expand the nation's railway network to respond to the tremendous growth and demand the railway has experienced - a doubling of passenger journeys over the past 20 years.

Follow us on Twitter: @networkrail
Visit our online newsroom: www.networkrailmediacentre.co.uk