Anglia
0330 8577 132
Urgent out-of-hours 0330 333 1800
Network Rail’s Anglia route comprises over 1,700 miles of track from London Liverpool Street station to Norwich in the east and Cambridge in the west, the North London Line from Gospel Oak to Barking East, and Essex Thameside from Fenchurch Street to Shoeburyness. With over 63.6 million passenger journeys, Liverpool Street is the third busiest railway station in Britain and the route is well connected with two airports, Stansted and Southend.
Latest news for this route
Public events to showcase latest plans to close or modify level crossings in Essex, Havering, Southend and Thurrock
People across Essex, Havering, Southend and Thurrock are being invited to a second round of consultation events next month to see Network Rail’s updated proposals to close or change the use of 61 level crossings across the region by altering the public Rights of Way network.
Full closure of Gospel Oak to Barking railway line starts 24 September
- Customers are being reminded that a full closure of the railway line between Gospel Oak and Barking will commence in late September following first phase of work
- Network Rail and Transport for London will be holding drop-in sessions at stations to answer questions
- From early 2018 passengers will benefit from four car trains that will provide double the space, reduce congestion and improve journeys
Photos: NASA-like installation of new railway bridge in Norwich
Photos have captured the moment a new railway bridge was rolled into place in Norwich, using similar self-propelled modular transporter machines that transport NASA rockets.
Wightman Road bridge replacement set to reopen
The reconstruction of Wightman Road bridge in Haringey, which runs over an important railway line connecting Gospel Oak and Barking, is almost complete and the road will reopen on Monday, 5 September.
Public events to showcase latest plans to close or modify Suffolk level crossings
People across Suffolk are being invited to a second round of consultation events next month in Ipswich, Bury St. Edmunds and Stowmarket to see Network Rail’s updated proposals to close or change the use of 31 level crossings across the county by altering the public Rights of Way network.
Public events to showcase latest plans to close or modify Cambridgeshire level crossings
People across Cambridgeshire are being invited to a second round of consultation events next month in March, Cambridge and Littleport to see Network Rail’s updated proposals to close or change the use of 33 level crossings across the county by altering the public Rights of Way network.
Train services into London Liverpool Street and Stansted Airport resume
Train services into London Liverpool Street and Stansted Airport are returning to normal following a gas leak near to Brimsdown station in Enfield.
Halesworth level crossing closure put on hold with new gates and signage to encourage safe use
The planned closure of the barrow crossing at Halesworth station in Suffolk has been postponed by Network Rail, hoping that an interim solution will change unsafe behaviour at the crossing.
Results 569 - 576 out of 924