Pictures & videos
London Bridge - digging out old signal cabling
Tuesday 26 May 2015
- part of the Thameslink Programme
First trains arrive at new London Bridge platforms
Monday 1 Sep 2014
First trains arrive at new London Bridge platforms, part of the Thameslink Programme
The very first ballast is delivered and laid on the approach to the new Borough Market viaduct
Monday 14 Sep 2015
The first ballast is delivered and laid on the approach to the new Borough Market viaduct this Saturday (September 12). London Bridge platforms 6,7, 8 and 9 grow in the background
First trains arrive at new London Bridge platforms
Monday 1 Sep 2014
First trains arrive at new London Bridge platforms, part of the Thameslink Programme
Borough Viaduct 1
Sunday 1 May 2011
A striking new railway bridge is launched into place over Borough High Street over a single weekend (30 April - 1 May 2011) to play a vital role in increasing capacity, reducing delays and providing better connections for the 50m passengers who travel through London Bridge every year. - Thameslink
Results 121 - 126 out of 126