Tuesday 1 Sep 2015

London Bridge August 2015

Regions:

A rail worker delivers new conductor rail to site at London Bridge, using a piece of equipment called an "Iron Man". All part of the Thameslink Programme

Download

London Bridge August BH (3 of 11).jpg
3510px * 5265px
11.73 MB
London Bridge August 2015: A rail worker delivers new conductor rail to site at London Bridge, using a piece of equipment called an