Pictures & videos
Work in progress at Cefn Viaduct
Tuesday 27 Aug 2013
£10.5m to modernise the railway in Wales and the border counties of England
Hale Road bridge, Ditton
Friday 27 Feb 2009
The bridge from track level, showing the support piers.
Billingshurst signal box is lifted onto the back of a low-loader
Monday 24 Mar 2014
Billingshurst signal box is lifted onto the back of a low-loader
Big Issue vendor pitch
Tuesday 16 Sep 2014
UK's first permanent Big Issue vendor pitch inside a station. Pictured: David Manso, Big Issue Vendor
Bolton-le-Sands level crossing
Thursday 22 Nov 2012
Bolton-le-Sands level crossing after renewal (Nov 2012)
King's Cross - new concourse and ticket hall
Monday 30 Mar 2009
King's Cross - new concourse and ticket hall
Watford area re-signalling programme
Monday 29 Dec 2014
We are renewing the track and signalling on Europe’s busiest mixed traffic railway through Watford Junction to provide a better, more reliable resilient railway.
Results 13577 - 13584 out of 17544