Pictures & videos
Bermondsey aerial
Thursday 11 Jun 2015
Demolition begins at Bermondsey. When complete, Charing Cross trains will arrive at top left, dive down, and run on a new railway diagonally top left to bottom right of the picture. Thameslink trains will arrive at top right, and pass over the Charing Cross lines as they head towards the centre- bottom of the picture. Both existing (and now disused) viaducts, middle and right, will be partly demolished.
Blackfriars South Bank Entrance 1
Sunday 6 Dec 2009
Blackfriars South Bank Entrance (part of the Thameslink Programme)
Anthony Martin of Keltbray is the 500th person to pass through the London Bridge Skills academy
Tuesday 11 Nov 2014
Anthony Martin of Keltbray on site at London Bridge station - as part of the Thameslink Programme
Thameslink - Blackfriars South bank
Monday 12 Mar 2007
Image of new Blackfriars South bank station (part of the Thameslink Programme)
HS2 tunnel segments concrete pour at Pacadar
Monday 7 Aug 2023
HS2 tunnel segments concrete pour at Pacadar
Bermondsey
Friday 17 Apr 2015
Railway Clearing House map of the Bermondsey area, showing Southwark Park's location and the tangle of railways . Being rebuilt as part of the Thameslink Programme
London Bridge-20
Tuesday 26 May 2015
- part of the Thameslink Programme
HS2 tunnel segments concrete pour at Pacadar
Monday 7 Aug 2023
HS2 tunnel segments concrete pour at Pacadar
Results 801 - 808 out of 907